Builder Address Request (RI) Request (FN) Requester (RI) Requester (FN) Status (RI) Status (FN) Inspected (RI) Inspected (FN)
7102 Kingsbridg...04/05/2016michaelPassed--04/06/2016
Submit Final
Tech Comments (RI):
Tech Comments (FN):
8204 Stillwater...07/11/2016michaelPassed--07/12/2016
Submit Final
Tech Comments (RI):
Tech Comments (FN):
7012 Derby Dr 3...07/19/2016michaelPassed--07/20/2016
Submit Final
Tech Comments (RI):
Tech Comments (FN):
8327 Anslee Way...07/20/2016michael va...Passed--07/21/2016
Submit Final
Tech Comments (RI):
Tech Comments (FN):
7016 Derby Dr 3...08/01/2016michaelPassed--08/02/2016
Submit Final
Tech Comments (RI):
Tech Comments (FN):
7014 Derby Dr 3...08/01/2016michaelNot Ready--08/02/2016
Re-submit Roughin
Tech Comments (RI):House already has sheetrock. unable to pass rough-in inspection. jw
Tech Comments (FN):
7019 Southgate ...08/04/2016michaelPassed--08/08/2016
Submit Final
Tech Comments (RI):Upstairs. seal all ducts in attic leadind to conditioned space on orherside. seal all edges of air barrier on raised wall in bedroom. insulate wall behind shower and add air barrier to attic wall and seal all seams. add air baffles in attic at least every 3 rafters. add top plate and insulate top sides of overlook. replace missing insulation on slope above front door. seal all corners. downstairs. seal edges of air barrier under stairs. seal all edges and seams and remove waste at top on air barrier in master bedroom. seal dryer vent and water pipes above master closet. seal wall bottom plate at floor. garage. garage ceiling insulation must be in continous contact weth floor above and secured in place block and seal ends or insulation in garage ceiling. block and seal between garage and conditioned space. add insulation in space left of brealer pannel. resubmit when complete and verified complete. rb
Tech Comments (FN):
8300 Stillwater...08/15/2016michaelPassed--08/24/2016
Submit Final
Tech Comments (RI):Insulate and add air barrier behind tub in master bathroom. add insulation barrier on garage wall in bedroom closet. add air barrier under water heater plateform. jw
Tech Comments (FN):
8221 Stonemill ...08/18/2016michaelPassed--08/19/2016
Submit Final
Tech Comments (RI):
Tech Comments (FN):
7640 Ashor Dr 3...12/13/2016danny harr...Passed--12/15/2016
Submit Final
Tech Comments (RI):
Tech Comments (FN):
5106 Devonshire...01/03/201705/24/2017michaelcmichael PassedNot Ready01/09/201705/24/2017
Re-submit Final
Tech Comments (RI):Downstairs- add insulation barrier above porch. seal all corners. seal hole on attic wall above dining room. garage- seal around ac duct above garage. block and seal above garage wall. upstairs- seal where ac duct meets unconditioned space. insulate under attic door. ------- --------permit number--463833-235051permit date--82616
Tech Comments (FN):Unit 1 furnace model number cm30bbba1aunit 2 furnace model number cm30abba1aoutdoors are straight air conditionersinsulation low in several spots. failed downstairs duct blaster. weatherstrip and insulate attic access panel.
5108 Devonshire...01/18/201705/24/2017michaelmichael PassedNot Ready01/25/201705/24/2017
Re-submit Final
Tech Comments (RI):Downstairs--return must have 200 sq inch per ton. grill size is currently 15x30.upstairs--add and seal air barriers in all duct chase closets. complete insulation in cavity on back wall. if you have any questions you can reach me at 256-924-2859isaac schrimsher
Tech Comments (FN):Failed downstairs duct blaster.weather strip and insulate pull down stairs.insulation in attic must be 10.5 inches with this type of insulation it is currently only averaging 8 inches.
5116 Devonshire...02/02/201705/24/2017michaelmichael PassedNot Ready02/07/201705/24/2017
Re-submit Final
Tech Comments (RI):Upstairs- add air barrier to outside wall in dead space. downstairs- add air barrier to garage wall under stairs. add air barrier to garage wall behind tub. block and seal garage band. tb
Tech Comments (FN):Unit 1 furnace model cm36bbca1aunit 2 furnace model cm30bbba1aoutdoor units are straight air conditionersfailed upstairs duct blaster
7105 Ensworth C...03/17/2017danny harr...Passed--03/28/2017
Submit Final
Tech Comments (RI):Downstairs-- block and seal between floors in back bedroom. blocking must be rigid material. add air barrier in dead space above closet beside stairs. garage--- block and seal between floors. add and seal air barrier in dead space under hot water heater platform. isaac schrimsher 256-924-2859------- --------469537-237765 permit date-- 122016
Tech Comments (FN):
7030 South gate...03/27/2017michaelPassed--03/31/2017
Submit Final
Tech Comments (RI):Upstairs-- add and seal top plate in dead space next to duct chase. add and seal air barrier in dead space next to balcony door. add and seal air barrier in dead space behind shower. downstairs-- add and seal air barrier under stairs. add and seal air barrier in dead space next to shower. ------- --------permit-468168-237052date-111716
Tech Comments (FN):
8227 Stone mill...03/27/2017danny harr...Passed--03/30/2017
Submit Final
Tech Comments (RI):Complete and seal air barrier behind tub on back wall. install r-30 batts above closet on garage wall. add and seal air barrier under hot water heater platform. seal around dryer pipe. isaac schrimsher 256-924-2859------- --------home is in anslee farms subdivision. 469914-237949 permit date--122916
Tech Comments (FN):
7004 Ashton spr...03/29/2017danny harr...Passed--03/30/2017
Submit Final
Tech Comments (RI):469540-237767 permit date-- 122016
Tech Comments (FN):
6004 Stonewater...04/17/2017danny harr...Passed--04/18/2017
Submit Final
Tech Comments (RI):
Tech Comments (FN):
7025 Camrose Ln...05/05/2017danny harr...Passed--05/05/2017
Submit Final
Tech Comments (RI):
Tech Comments (FN):
7615 Addison Dr...06/15/2017danny harr...Passed--06/16/2017
Submit Final
Tech Comments (RI):Add air barrier behind tub on garage wall and seal edges. add air barrier in dead space and seal edges. seal penetrations in air barrier under stairs. tb
Tech Comments (FN):
504 Balsam terr...06/19/2017michaelNot Ready--06/23/2017
Re-submit Roughin
Tech Comments (RI):Downstairs.add ait barrier to chase on garage wall.seal penitrations in garage band. seal air barrier behind fireplace.seal wire penitrations in garage under conditioned space.must have 200 square inches per ton of return.upstairs.add and seal top playe in duct chase.repair insulation barrier on attic walls.insulate tray celing above front porch.add air barrier to duct chase to right of front door upstairs and seal.jd
Tech Comments (FN):
7048 Camrose Ln...07/25/2017danny harr...Passed--07/25/2017
Submit Final
Tech Comments (RI):
Tech Comments (FN):
8325 Anslee Way...07/25/2017danny harr...Passed--07/25/2017
Submit Final
Tech Comments (RI):Permit-472653-239291date-22417
Tech Comments (FN):
307 Lady hawk L...07/31/2017scottPassed--08/01/2017
Submit Final
Tech Comments (RI):
Tech Comments (FN):
8302 Stillwater...08/24/2017danny harr...Passed--08/25/2017
Submit Final
Tech Comments (RI):Permit 477346-241651 date 5-24-17
Tech Comments (FN):
8312 Stillwater...08/24/201709/27/2017danny harr...james ridd...PassedNot Ready08/25/201709/28/2017
Re-submit Final
Tech Comments (RI):Permit 476845-241392 date 5-16-17
Tech Comments (FN):Seal return.
7638 Ashore Dr ...09/01/201710/20/2017danny harr...michael PassedNot Ready09/01/201710/20/2017
Re-submit Final
Tech Comments (RI):
Tech Comments (FN):Attic insulation very low in spots. must have a minimum of r-30 throughout. seal return grilles. ---------------failed duct blaster test
7628 Ashor Dr 3...09/22/2017michaelNot Ready--10/05/2017
Re-submit Roughin
Tech Comments (RI):Upstairs- insulate behind osb on attic wall. repair air barrier beside air handler. downstairs- seal penetrations in blocking in master bathroom. block and seal garage band. seal penetrations in blocking. jw---------------upstairs- repair air barrier beside air handler. downstairs- seal penetrations in blocking in master bathroom. block and seal garage band. tb
Tech Comments (FN):
5111 Devonshire...09/25/2017michaelPassed--09/26/2017
Submit Final
Tech Comments (RI):Permit number 475952-240944 issued 4-28-17
Tech Comments (FN):
7009 Camrose Ln...10/16/2017michaelPassed--10/20/2017
Submit Final
Tech Comments (RI):Upstairs-add and seal top plate in duct chase, add and seal air barrier on outside wall in duct chase in front of stairs. -add and seal air barrier to outside wall in duct chase behind stairs. downstairs-block and seal over entire porch. -block and seal garage band. -add and seal air barrier on outside wall under stairs in dead space.
Tech Comments (FN):
8336 Anslee Way...10/17/2017michaelPassed--10/24/2017
Submit Final
Tech Comments (RI):Upstairs-- add and seal top plate in duct chase dead space. seal bottom of hvac duct around return in dead space. add batt insulation on all slope ceilings. add and seal air barrier and fill cavity with insulation in dead space on exterior wall next to shower. fill cavity with insulation on exterior wall. fill cavities with insulation above front door and above left side of front door. downstairs--- add and seal air barrier where missing under stairs. seal penetrations in air barrier under stairs. seal corner on garage wall. add and seal air barrier behind shower on garage wall. garage-- insulation must be in contact with floor above garage. finish insulating cavities above garage. kp 256-924-2808---------------upstiars-seal top plate in duct chase next to attic access. downstairs-seal corner on garage wall next to front door.
Tech Comments (FN):
6006 Barringer ...10/30/201712/21/2017michael va...michael va...PassedNot Ready11/08/201712/26/2017
Re-submit Final
Tech Comments (RI):Seal blocking on garage band. insulate cantilevered floor over porch. seal penetrations in air barrier under stair landing platform. upstairs-- add and seal air barrier in duct chase dead space on exterior wall. seal top plate in both duct chase dead spaces. ---------------add and seal air barrier in dead space and seal top plate with foam not insulation upstairs.---------------add air barrier in duct chase at top of stairs seal gas and wires under floor in garage. add insulation in double wall at shower. insulate top to bottom. returns area not big enough for 4 ton unit. add air barrier under stair landing on garage wall. rick
Tech Comments (FN):Insulate and weatherstrip attic pull down or install insulated attic tent. seal sheetrock around return.
6012 Barringer ...10/30/201712/22/2017michael va...michael va...PassedNot Ready11/08/201712/26/2017
Re-submit Final
Tech Comments (RI):Block and seal garage band where missing. seal all gaps and penetrations in blocking on garage band. add staves to insulation over garage. insulation must be in contact with floor above garage. upstairs-- add and seal top plate in duct chase dead space. ---------------block and seal garage band where missing. seal all gaps and penitrationa in garage band. insulation must be in contact with subfloor above. completely seal top plate in duct chase.---------------block and seal garage band at corner. insulation above garage must be in contact with sub floor above. resubmit once work is complete. jw
Tech Comments (FN):Insulate and weatherstrip attic pull down or add insulated attic tent. fix broken window upstairs and weatherstrip all exterior doors.
8310 Stillwater...11/28/2017michael va...Passed--11/28/2017
Submit Final
Tech Comments (RI):
Tech Comments (FN):
7620 Ashor Dr 3...11/30/2017michael va...Not Ready--12/06/2017
Re-submit Roughin
Tech Comments (RI):Downstairs-block and seal between floors above master bath. -insulate under decking where insulation cannot be blown in front of stairwell. -insulate decking where insulation cannot be blown into above garage entry. ---------------sheet rock installed cannot verify repairs. ---------------cannot verify repairs due to sheet rock being hung.
Tech Comments (FN):
515 Balsam terr...12/14/2017danny harr...Passed--01/09/2018
Submit Final
Tech Comments (RI):Downstairs- block and seal living space above front porch. insulate living space above front porch. block and seal between floors by front door. repair air barrier on attic wall in dinning room. seal around supply line going between floors above fireplace. seal around supply and flex house going between floors in master closet. insulate attic space under decking where insulation cannot be blown. block and seal garage band. insulate living space above garage. seal all penetrations on garage band. upstairs- insulation exterior wall in dead space and add air barrier. slope in closet needs to be at least r-19. add and seal top plate left of tub. insulate slope above tub. add insulation barrier left of tub. add insulation barrier above attic wall. add air barrier and insulate on side of slope. add air barrier on attic wall in stairwell. finish insulation throughout house. jw---------------upstairs- slope in closet needs to be 2x6 to hold r-19 insulation. add top plate and add air barrier to right of closet in dead space. left side of closet needs to be framed around above door to hold insulation and have air barrier installed on back of attic wall.add insulation barrier over attic wall in bedroom. add air barrier and insulate cavities above tub. seal tears in air barrier on attic walls where ac is located. add air barrier around attic door and insulate cavities around door. jw---------------upstairs. insulate attic space above tub and dead space. seal top plate of dead space. insulate back wall of closet and add air barrier. frame front wall of closet. continue insulation in top of front closet. insulate right wall of closet in bedroom and add air barrier to back wall of dead space and seal top plate of dead space. insulate areas around attic door. seal blocking on center of garage wall. insulate top above water heater platform. please make sure all work is completed before resubmitted rb
Tech Comments (FN):
7106 Kingsbridg...12/29/2017brentNot Ready--01/02/2018
Re-submit Roughin
Tech Comments (RI):Downstairs. seal top plate and hole at top of fireplace. add to bottom of air barrier and seal on stairs wall. install r 19 on complete front wall and around front door upstairs. add top plate and seal ducts at both pipe chases. repair air barrier on upper attic wall. rb
Tech Comments (FN):
8327 Stillwater...01/03/201806/14/2018michael va...james ridd...PassedNot Ready01/12/201806/14/2018
Re-submit Final
Tech Comments (RI):Seal between floors. repair air barrier on attic wall and insulate cavities behind tub. add air barrier under stairs. add air barrier behind tub. seal blocking between floors in garage. repair air barrier behind return upstairs and block and seal between floors over back porch. mechanical ventilation has to be installed before final inspection. -kp---------------block and seal between floors over back porch. add air barrier behind tub next to garage. -kp
Tech Comments (FN):House does not have enough mechanical ventilation to meet energy code. currently house only has one fan with control switch pulling 30 cfms and home needs 63 cfms. you may install another smart switch to another fan to meet energy code. house failed duct blaster and insulate and weatherstrip attic pull down or install attic tent. seal both returns. rw 3-28-18---------------house does not have enough mechanical ventilation to meet energy code. currently house only has one fan with control switch pulling 30 cfms and home needs 63 cfms. you may install another smart switch to another fan to meet energy code. house failed duct blaster seal both returns.---------------house failed duct blaster. do not resubmit until entire hvac system has been thoroughly checked and sealed. rw 6-6-18---------------6-14-18 we have tested this house multiple times. duct blaster failed. do not resubmit until duct work, registers, and returns have been checked by your hvac contractor.
7106 Kingsbridg...01/03/201803/01/2018brentmichael PassedNot Ready01/04/201803/08/2018
Re-submit Final
Tech Comments (RI):
Tech Comments (FN):Home owner occupied
8344 Anslee Way...02/13/2018michael va...Passed--02/21/2018
Submit Final
Tech Comments (RI):Upstairs-add and seal top plates in all duct chases. insulation cannot be used must be ridgid material. insulate all raised walls in master bath. insulate cavity on slope ceiling in master bath. insulation must be in contact with sheet rock in master bath and in master bedroom. insulate under a/c platform. downstairs-add air barrier under stairs in dead space. insulate behind electrical box. finish insulating living space above garage. seal around duct work on garage band. -kp
Tech Comments (FN):
7005 Ashton spr...04/12/201805/25/2018james ridd...james ridd...PassedNot Ready04/13/201805/29/2018
Re-submit Final
Tech Comments (RI):
Tech Comments (FN):Failed duct blaster. -kp 5-29-18
7108 Kingsbridg...04/23/2018michael va...Passed--04/24/2018
Submit Final
Tech Comments (RI):
Tech Comments (FN):
5112 Devonshire...04/26/2018michael va...Passed--04/26/2018
Submit Final
Tech Comments (RI):
Tech Comments (FN):
6016 Barringer ...05/03/2018james ridd...Passed--05/04/2018
Submit Final
Tech Comments (RI):Upstairs-add air barrier in duct chase in master bath. downstairs-add air barrier under stairs. -kp
Tech Comments (FN):
8330 Ansley way...05/03/201806/27/2018james ridd...james ridd...PassedNot Ready05/07/201806/29/2018
Re-submit Final
Tech Comments (RI):Upstairs-add air barrier in dead space next to tub. downstairs-seal all penetrations on garage band. add air barrier behind tub on garage wall. add air barrier under stairs and dead space under stairwell. -kp
Tech Comments (FN):Homeowners moving in. derrick blackwell 256-924-4828
7002 Ashton spr...05/09/2018james ridd...Passed--05/09/2018
Submit Final
Tech Comments (RI):
Tech Comments (FN):
5113 Devonshire...05/22/2018michael va...Not Ready--05/22/2018
Re-submit Roughin
Tech Comments (RI):Downstairs = add air barrier behind tub and seal corner on garage wall. seal and insulate band on garage wall. add air barrier under stairs on garage wall. upstairs = seal duct chase to attic, seal large gaps in attic wall, insulate under a/c platform, add insulation barrier above top plate on master bath walls. return cannot use ceiling rafter as part of return box.
Tech Comments (FN):
8318 Still wate...05/24/2018james ridd...Not Ready--05/29/2018
Re-submit Roughin
Tech Comments (RI):Upstairs-add air barrier behind tub. add air barrier in both dead spaces next to tub. -kp---------------seal all blocking on garage band and far left cavity where refrigerant lines and plumbing lines go through rw
Tech Comments (FN):
8320 Still wate...07/09/2018james ridd...Passed--07/10/2018
Submit Final
Tech Comments (RI):
Tech Comments (FN):
7900 Gabriela D...07/12/2018james ridd...Passed--07/17/2018
Submit Final
Tech Comments (RI):Upstairs-repair air barrier behind fire place. add and seal top plates in duct chases in master bedroom and bathroom. -kp
Tech Comments (FN):
7618 Ashor Dr 3...07/13/201808/23/2018james ridd...james ridd...PassedNot Ready07/13/201808/24/2018
Re-submit Final
Tech Comments (RI):
Tech Comments (FN):Failed duct blaster, seal returns. ray wooten 924-8983
126 Amelia Dr 3...08/20/2018scottPassed--09/26/2018
Submit Final
Tech Comments (RI):Downstairs- insulate garage band and seal around supply line in band. insulate above fireplace and seal top plate above fireplace. seal corner of garage in pantry.2nd floor- insulate cavities completely left of tub. add and seal top plate above fireplace. seal top plate by master bedroom. add air barrier in dead space right of stairs in master closet and seal top plate. upstairs- add air barrier in ac closet. add and seal top plate in duct chase. add air barrier in duct chase and dead space left of tub. seal top plate in dead space. add air barrier behind tub. jw---------------3rd floor add air barrier behind tub on faucet side. add top plate in duct chase in dead space left of tub. 2nd floor add top plate above fireplace and seal. insulate cavity fully left of bathtub on western facing outside wall. insulation must be behind ladder framing. first floor block and seal garage band using rigid material. blocking and top plates must be rigid material. insulation is not accepted as blocking or top plate. ray wooten 256-924-8983
Tech Comments (FN):
160 Little burw...09/17/2018scottPassed--09/26/2018
Submit Final
Tech Comments (RI):1st floor - insualte cavity right of front door. 2nd floor - add air barrier in duct chase in master closet. add and seal top plate in duct chases in master closet. add air barrier behind tub in master bathroom. add air barrier under stair landing. insulation in front bedroom needs to be pulled down to be in contact with sheetrock. feel 2x6 wall with insulation at least r19. 3rd floor - add air barrier on back side of insulation in duct chase right of tub. add air barrier in duct chase in all duct chases upstairs. seal all wire penetrations. insulate walls in duct chase and add air barrier. cut access panel to access attic space in closet. add air barrier in top plate in duct chase in bedroom. add air barrier in a/c closet. -jw
Tech Comments (FN):

© Copyright Huntsville Utilities Forms Support FAQ Supported Browsers Privacy Policy Terms of Use Site Map
Huntsville Utilities is an equal opportunity residential utility service provider. We do not discriminate in the terms, conditions, or provision of services based on race, color, religion, sex, disability, familial status, or national origin.

Huntsville Utilities es un proveedor de servicios residenciales publicos (electricidad, gas y agua) que ofrece igualdad de oportunidades. Nosotros no discriminamos en los terminos, las condiciones, o las provisiones de nuestros servicios basados en la raza, religion, color, sexo, discapacidad, estado familiar u origen nacional.