|
|
![]() Customer Service |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
High Level Service FeesEffective September 26, 1986 Any service line that is tapped on a main served by one of the following reservoirs requires a $482 high-level fee per lot/unit in addition to the regular tapping fee. Big Cove Any service line that is tapped on a main served by one of the following reservoirs requires a $964 high-level fee per lot/unit in addition to the regular tapping fee. Inspiration Point Any 1" service line that is tapped onto an existing water main on Green Mountain requires a $2,589 tapping fee per lot/unit. System Development Charges (SDC)These fees are applied to each meter to be installed in areas with water service from Huntsville Utilities. These fees are due from the developer at the time of Aid-to-Construction (ATC) payment and from the builder at the time of the meter request. SDC Fee Chart Frontage FeesFrontage Fees may be required for property located on any of the following roads due to previous main extensions or parts of the county system taken over by Huntsville Utilities. Please contact Water Engineering for more information. Bailey Cove Rd. (Mtn. Gap south to Green Cove Rd.) Note: In developed and platted subdivisions (since 1984), high level fees and impact fees are generally collected in advance from the Developer as a part of his aid-to-construction, and as a rule, separate frontage fees will only apply to individual lots being developed outside newly platted subdivisions or to lots in minor subdivisions where aid-to-construction may not be required from the Developer. Contact Water Engineering for further information at (256) 535-1400 or email wtreng@hsvutil.org.
|